MAINTENANCE
– Before starting FIG.1 PUMP “JARRO” TYPE, we will mainly take into account that the assembly will be carried out in vertical position and that a suction valve will be located in the lower parto of the suction tuve that will ensure a continuous and correct priming of the pump.
– At the first start-up, it will be necessary to prime the pump by introducing wáter from the top, and then proceed with pumping. This is done making a ¼ turn back (suction) and anothert ¼ turn forward (discharge). After a few moments, it will need more effort to do this operation. It is a sign that the pump has already filled the pipe with wáter and is operational.
– It will not be necessary to use any other type of maintenance except the use of the pump at least once every 15 days approximately to avoid its seizure.
We manufacture any DN, PN, or special specification at our facility in Paterna.
Our technical team responds within 24 hours.
Utilizamos cookies propias y de terceros para garantizar el correcto funcionamiento del sitio web y, con tu consentimiento, analizar la navegación y mejorar nuestros servicios. Puedes aceptar, rechazar o configurar las cookies según tus preferencias. Consulta nuestra Política de Cookies para más información.